Thursday, September 16, 2010

Lodge Group Bike Ride Schedule - September 18 & 19

Please note CORONA ROAD will be closed beginning 13 September 2010 to all vehicular traffic for approximately six (6) months for the Corona Road Weir Safety Improvements Project between Ponte Vedra Blvd. and Rutile Drive.

Pedestrian access will be provided on weekends only.

The cool down thru the neighbor hood we maybe able to cross on Pedestrian Access on Saturday and Sunday. Otherwise we will have to ride up PVB to Corona Road to San Jose to finish our cool down part of the ride.

Please Remember with the large Saturday morning bike ride group it is a warm up ride speed around 20 MPH "Neutral Zone" to the Palm Valley bridge.

Saturday – 8:00 AM @ the Lodge – 35 to 40 miles
Group AA = 25+ MPH
Group A = 19 – 25 MPH
Remember it is a warm up ride to the Palm Valley Bridge.
See link for the Map on the right.
Group AA will make Right at Crosswater Parkway.
Group A will make a Left at Crosswater Parkway

Sunday – 7:30AM @ the Lodge – 40-60 miles
Group Ride Ride Pace = 19 – 22 MPH.
Remember this is a GROUP ride.
We will regroup when necessary for those loosing contact with the group.
Let’s try to keep everyone together back to the Palm Valley Bridge

No comments:

Post a Comment