Friday, May 11, 2012

BFSC Ride Schedule - May 12 & 13


It is TPC weekend down in Ponte Vedra Beach. Watch out for the increased traffic. In the past our Saturday and Sunday rides follow routes or have been completed with out much impact from the traffic.

The Giro de Italy has started though Sunday, May 27. It’s a shame Comcast does not carry Universal TV any more, but I understand it is on satellite network Dish or Direct TV.  You can follow the Giro on the Internet live feed on: http://cyclingfans.com/live_race_coverage

Amgen Tour of California starts on May 13 to 20. It will be covered live for the first time on NBC Sports TV that Comcast 448.

Sun., May 13 Stage 1– Santa Rosa to Santa Rosa 5-7 p.m. NBCSN
Mon., May 14 Stage 2– San Francisco to Santa Cruz County 5-7 p.m. NBCSN
Tues., May 15 Stage 3– San Jose to Livermore 5-7 p.m. NBCSN
Wed., May 16 Stage 4– Sonora to Clovis 5-7 p.m. NBCSN

Thurs., May 17 Stage 5– Bakersfield (Individual Time Trial) 5-7 p.m. NBCSN
Fri., May 18 Stage 6– Palmdale to Big Bear Lake 5-7 p.m. NBCSN
Sat., May 19 Stage 7– Ontario to Mt. Baldy 7-9 p.m. NBCSN
Sun., May 20 Stage 8– Beverly Hills to Los Angeles 1-3 p.m. NBC

Stage 8– Beverly Hills to Los Angeles (re-air) 6:30-9 p.m. NBCSN

Saturday, May 19 is the first BFAS first Sprint Triathlon at Mickler’s Beach.

Beaches Weekend Weather Forecast (observed at Mayport Naval Air Station)

The Beaches Weekend weather calls for on Saturday’s start time 71F, 16 mph E wind, and cloudy 20% chance of rain either in the morning or afternoon. On Sunday the forecast at the start time is 70F, 13 mph E wind and cloudy with 40% chance of rain.

   
Beaches First Street Cycling Ride Schedule

On Saturday there are Group 2 now!
 
Saturday – 8:00 AM @ the Lodge – 40 miles
The BFSC Saturday Ride warms up together for the first 5 to 6 miles.
The Ride Pace begins to pick up quickly to the Palm Valley Bridge.
The BFSC splits into 2 groups base on Ride Pace either at the PV Bridge
Or at the Traffic Light at Crosswater Parkway & Old 210
Group 1 = Ride Pace 25+ MPH with max speed 30+
Group 2 = Ride Pace 19 – 25 MPH 
See link for the Map on the right. 
Group 1 will make Right at Crosswater Parkway. 
Group 2 will make a Left at Crosswater Parkway
  
Sunday - 8:00 AM Road Ride Leaving from the Lodge – 50 - 60 miles
Group Ride Ride Pace = 19 – 22 MPH.
Remember this is a GROUP ride.
We will regroup when necessary for those loosing contact with the group.
We have been trying to keep everyone together back to the Palm Valley Bridge,
 so that everyone finishes the ride together.

ALL RIDE MILLAGE IS BASED on from the starting location: The Lodge and back to The Lodge


No comments:

Post a Comment